Skip to content

Services

House extensions

More room for a kitchen, a living space or a bedroom, built onto the house you already have.

Extension interior with new concrete floor, blockwork walls, roof joists, rooflight and French doors fitted
Single-storey rear extension with a new kitchen.

What it covers

Extensions built onto your house, from the footings to the roof. Our own jobs include single-storey and two-storey rear extensions and a brick front porch.

Planning first

Many single-storey rear extensions are permitted development: up to 3 metres beyond the original rear wall on a semi or terrace, 4 metres on a detached house, and no more than 4 metres high.

Deeper ones, up to 6 or 8 metres, go through prior approval. The council writes to your neighbours, and work can start once it agrees or 42 days pass without a decision.

In a conservation area or the New Forest National Park, side extensions and two-storey rear extensions need full planning permission.

Building regulations

You need approval from building control, either the council or a registered approver.

New walls, floors and roofs must meet the Part L insulation standards. Glazing is capped at 25% of the new floor area, plus any windows the extension covers, unless a calculation shows it works.

Neighbours

Building on the boundary, or digging foundations close to next door, needs a party wall notice first.

What you need to know

Planning
Often not needed for a single-storey rear extension, within size limits. Tighter in conservation areas and the New Forest National Park.
Building regulations
Nearly always needed, including the Part L insulation standards.
Party wall
A notice to next door if you build at the boundary or dig near their foundations.
Structural engineer
Calculations for any beam or new opening that carries load. Building control usually asks for them.
Building control
The council or a registered approver can inspect the work in stages, and signs it off when it complies.

These are the general rules, from GOV.UK and the Planning Portal. Every house is different, so check your own job with the council or building control.

How a job runs

  1. Step 1: Enquire

    Ring, or send a few lines about the extension and your postcode.

  2. Step 2: Visit and quote

    We come out, look at the house and the ground, and give you a free no obligation quote.

  3. Step 3: Build

    Then the paperwork, the build and sign-off.

Free no obligation quotes.

The work

Photos from our own jobs.

Photo

See all projects

Questions about extensions

Do I need planning permission for a single-storey rear extension?

Often not. Under permitted development you can go up to 3 metres beyond the original rear wall on a semi or terrace, and 4 metres on a detached house, up to 4 metres high. Eaves within 2 metres of a boundary are limited to 3 metres. Conservation areas, the National Park and some estates have tighter rules, so check before you commit.

What is prior approval for a larger extension?

It lets a single-storey rear extension go deeper: up to 6 metres on a semi or terrace and 8 metres on a detached house. You notify the council, it writes to your neighbours, and work cannot start until it says no approval is needed, gives approval, or 42 days pass without a decision. It is not available in conservation areas or the National Park.

Does an extension need building regulations approval?

Nearly always. You apply to building control, either the council or a registered building control approver. Full plans is the thorough route, with a decision within 5 weeks, or 2 months if you agree. A building notice suits smaller jobs and lets work start 2 days after it goes in, but there is no formal approval of the plans.

Do I need a party wall agreement?

You need to serve notice if you build on or at the boundary, work on a shared wall, or dig foundations within 3 metres of next door's building and deeper than their foundations, or within 6 metres in some cases. Notice for party wall work goes 2 months ahead, for excavation 1 month. If they do not agree in writing within 14 days, surveyors settle it.

How much glass can I have in an extension?

The standard route caps windows, rooflights and glazed doors at 25% of the extension's floor area, plus the area of any windows and doors the extension covers up. More glass is possible if a calculation shows the extension performs as well as a standard one. New windows need a U-value of 1.4 or better.

How much will my extension cost?

It depends on the size, the ground, the roof, the finish and what goes inside, such as a kitchen or a bathroom. Drawings, engineer's calculations, building control fees and any party wall costs can sit on top of the build. Ring, or send a few lines and ask us for a free no obligation quote.

Get a quote

Ask for a free no obligation quote

Ring, or send a few lines about the job and your postcode.